Project: High speed railway. Section Rialiño-Padrón.
Start end dates: September 2009-March 2011
Client: FERROVIAL
Description: Total length 2411 m, 46 spans. Maximum span length 55 m.maximum pier hight 21 m.
Executed with overhead movable scaffolding system (mms).