Privacy preferences

Consent management

Cookies usedMandatory

I have read and accept the Privacy Policy.

Mandatory

These cookies are necessary for the website to function and cannot be deactivated in our systems. In general, they are only set in response to actions taken by you that amount to a request for services, such as setting your privacy preferences, logging in or filling out forms.

Cookies used Mandatory

PHPSESSID, atesvionlineCookieAnalitycs, atesvionlineCookie

AnalĂ­ticas

These cookies allow us to measure the number of visits and to know the sources of traffic. They help us to know which pages are the most and the least popular and to know how visitors move around the site. All the information that these cookies collect is aggregated and therefore anonymous. If you do not allow these cookies, we will not know when you have visited our site.

Cookies used

How to withdraw consent
_ga,_gid,_gat,

google.com

_ga,_gid,_gat,
Attention! This site uses cookies and similar technologies. If you do not change your browser settings, you agree to their use.

Linning tunnel formworks

19
OCT
2020
Specifications:

Description: ATESVI has equipment with radii ranging from 6.08 m to 7.26 m and lengths ranging from 12 m to 15 m. In mass concrete cladding sections, daily laying yields are achieved. In reinforced concrete sections, a weekly laying rate is achieved.

19/10/2020
19/10/2020
19/10/2020
19/10/2020