Viaducto del Sar (La Coruña)

Specifications:

  • Project: High speed railway. Section Rialiño-Padrón.
  • Start end dates: September 2009-March 2011
  • Client: FERROVIAL
  • Description: Total length 2411 m, 46 spans. Maximum span length 55 m.maximum pier hight 21 m. Executed with overhead movable scaffolding system (mms).